[1] |
CHEN Hexin, HU Liqiang.
Study on Modification and Ratio Optimization of Unclassified Tailings Filling Material in a Gold Mine
[J]. Metal Mine, 2023, 52(09): 24-28.
|
[2] |
ZHANG Min-Jie- , ZHANG Jun-Ming.
Experimental Study on the Strength of Cemented Paste Backfill Proportion with Sulphide-rich and Ultra-fine Unclassified Tailings
[J]. Metal Mine, 2020, 49(06): 161-166.
|
[3] |
WANG Liu-Bao, LIU Yan-Zhang, YIN Dong, JIANG Wei, ZHANG Guo-Quan, CAI Yuan-Tian.
Determination of Reasonable Width of Isolation Pillar between Caving Method and Filling Method in Same Level Mining Areas of Daye Iron Mine
[J]. Metal Mine, 2020, 50(05): 89-94.
|
[4] |
LUO Yin-Fei, WANG Zhi-Ming, ZHAO Zhen, DUAN Long-Chen, JIANG Wei.
Design and Implementation of The Control System for Mud Circulation Purification Device Based on PLC
[J]. Metal Mine, 2019, 48(11): 169-175.
|
[5] |
CAO Jian-Li, TAN Bao-Hui, ZHANG Dong-Jie.
Study on the Method of Rock Movement Control in Mengjiapuzi Iron Mine
[J]. Metal Mine, 2019, 48(11): 1-7.
|
[6] |
CHAI Xiao-Ran, SUN Wu-Cheng, DUAN Long-Chen, DONG Gao-Feng, ZANG Li-Ping.
Design and Development of Mechanical System for an Automatic Mud Circulation and Purification Device
[J]. Metal Mine, 2019, 48(07): 182-188.
|
[7] |
WEI Xiao-Ming, LI Chang-Hong.
Sensitivity Analysis of Strength of Cemented Backfill and Ratio of Optimization
[J]. Metal Mine, 2016, 45(06): 37-42.
|
[8] |
ZHANG Li-Xin.
Change Laws of the Strength of High Level Cemented Backfill Body
[J]. Metal Mine, 2015, 44(11): 42-44.
|
[9] |
GAN De-Qing, GAO Feng, CHEN Chao, LU Hong-Jian, ZHANG Ya-Bin.
Study on Critical Conveying Velocity of Full-tailings Filling Slurry of High Concentration
[J]. Metal Mine, 2015, 44(11): 22-26.
|
[10] |
YANG Zhi-Qiang, SU Lin, GAO Qian, YANG Xiao.
Exploitation and Application of a New Filling Cementing Materials with Full Tailings of Iron Mine
[J]. Metal Mine, 2015, 44(08): 163-168.
|
[11] |
LI Mao-Hui, GAO Qian, WANG You-Tuan, YANG Yun-Peng.
Pilot Tests on the New Cementing Materials Preparation for Filling in Sijiaying Iron Mine
[J]. Metal Mine, 2013, 42(08): 153-156.
|
[12] |
MENG Ling-Min.
Application of Underground Water Source Heat Pump Air-conditioning System in Xingshan Iron Mine of Capital Steel
[J]. Metal Mine, 2013, 42(03): 145-147.
|
[13] |
LI Tao, WANG Hong-Jiang, WU Ai-Xiang, SUN Wei.
Study on Properties of Mixed Disposal Paste with Unclassified Tailings and Waste Rock in a Mine
[J]. Metal Mine, 2012, 41(12): 123-126.
|
[14] |
YAN Dong-Fei, MA Feng-Shan, ZHANG Ya-Min, GUO Jie, GUO Hui-Gao, WANG Hu.
Feasibility Study on Equal Cement-sand Ratio Backfill based on Stability Judgment of the Filling Body
[J]. Metal Mine, 2011, 40(10): 41-43+54.
|
[15] |
HU Yong-Quan, ZHANG Chuan-Xin, KUANG Yu-Sheng, SUN Hao.
Research of Treatment Engineering of Xishan Mined-out Area in Dongguashan Copper Mine and its Practice
[J]. Metal Mine, 2011, 40(05): 23-27.
|