[1] |
DONG Yaning, LI Guoping, SUN Maogui, YIN Dengcai.
Combined Technique of Curtain Grouting and Long Anchor Cable at the Joint of Fractured Rock Chamber
[J]. Metal Mine, 2023, 52(11): 148-153.
|
[2] |
CAI Xingqi, DONG Wenming, TAN Qiren, YU Zhi, BI Lin.
Blasting Process Optimization Based on Grade Control Model in Openpit Uranium Mine
[J]. Metal Mine, 2022, 51(07): 105-112.
|
[3] |
CHEN Xin ZHANG Qingsong WANG Fenggang LIU Yanan, LIU Yankai GUO Yanxu JIANG Qichen.
Technical Scheme of the Integrated Treatment for the Weakness Zone of the Existing Water Plugging Curtain in Zhangmatun Iron Mining Area
[J]. Metal Mine, 2021, 50(05): 190-196.
|
[4] |
Lü Chao, XIE Feng, XIE Lizhi, LI Bo, MA Yuanlin.
Experimental Study on Process Optimization of a High Sulfur Lead-Zinc Mine in the Northeast Yunnan
[J]. Metal Mine, 2021, 50(03): 110-115.
|
[5] |
TAN Xiaotong, WANG Zhiqing, REN Xiujun, HAN Tianfang, ZHAO Xin.
Advances in Bioleaching Critical Metals from Electronic Waste
[J]. Metal Mine, 2020, 49(11): 71-78.
|
[6] |
ZHOU Hua-Rong, XU Yong-Wei, ZHANG Hui-Ting, WENG Cun-Jian, WANG Peng-Cheng-3, LUO Xian-Ping.
Optimization Research of a Lead-zinc Sulfide Ore Beneficiation Process in Qinghai
[J]. Metal Mine, 2019, 48(07): 103-107.
|
[7] |
ZHU Chuan-Qi, KOU Jue, SUN Fa-Zhao, HUANG Wen-Hao, MA Shu-Xian, SUN Chun-Bao.
Research on Improving the Recovery of Once Alloy in Nickel Matte
[J]. Metal Mine, 2019, 48(03): 95-99.
|
[8] |
南Nan , ZHU Yi-Min, HAN Yue-Xin, CHEN Jin-Xin.
Optimization of Phosphorus Recovery Process on Iron Tailings by New Room Temperature Collector DJX-6
[J]. Metal Mine, 2019, 48(02): 121-124.
|
[9] |
PENG Hui-Qing, HUANG Xin, LUO Wen, SHAO Hui.
Study on Optimization of Flotation Process on a Molybdenum Ore
[J]. Metal Mine, 2019, 48(01): 83-86.
|
[10] |
XU Shou-Xin, YAN Wei-Shan, QI Ze-Wen.
Research on Digital Mining Technology in JISCO Xigou Mine
[J]. Metal Mine, 2018, 47(11): 171-175.
|
[11] |
CHENG Hai-Yong, WU Ai-Xiang, LUO Gan-Hua, WANG Yi-Ming.
Mechanics Analysis and Construction Process of Light-weight Retaining Wall for Backfill
[J]. Metal Mine, 2016, 45(09): 58-61.
|
[12] |
CONG Ying.
Optimization of Copper Beneficiation Process for a Refractory Copper Ore in Qinghai
[J]. Metal Mine, 2015, 44(11): 74-77.
|
[13] |
YANG Zhu, WANG Jun, ZHAO Qia.
Test and Parameters of Curtain Grouting for the Tectonic Fissured Water-rich Deposits
[J]. Metal Mine, 2015, 44(04): 44-47.
|
[14] |
GENG Wei-Li, LUO Tian-Ming, GUO Wen-Jun.
The Current Situation and Development of Fine Grained Lead-Zinc Ore Flotation Technology in China
[J]. Metal Mine, 2015, 44(03): 116-119.
|
[15] |
WANG Wen-Feng, GAO Feng, XU Zhi-Cheng.
Techniques of Underground Water Leakage Control in Meishan Iron Mine
[J]. Metal Mine, 2015, 44(03): 40-43.
|