Abstract: The exposed upper plate and roof area of the No.2 ore body mined-out area of a multi-metal mine in Inner Mongolia is about 0.1 million square meters,and the mined-out area is in irregular shape with wide distribution and staggered overlapping.According to the status of mined-out and the existing production facilities,the method of compulsory caving rock on the plate and inducing rock avalanche on the disk gradually filling mined-out area is recommended through comparative analysis,forming the buffer security cushion with a certain thickness above the operation area.Also,how to determine the safe thickness of the buffer cushion is researched,thus providing a reference for the similar large mined-out area.
Key words: Multi-metal mine, Treatment of mined-out area, Caving wall-rock, Buffer cushion
ZHANG Fei, TIAN Rui, JIAN Yu-Rong, WANG Jian-Jun. Discussion on the Treatment Scheme of Mined-out Area of No.2 Ore Body of a Multi-metal Mine in Inner Mongolia[J]. Metal Mine, 2011, 40(07): 47-50+73.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.jsks.net.cn/EN/
http://www.jsks.net.cn/EN/Y2011/V40/I07/47