欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2013, Vol. 42 ›› Issue (07): 35-37.

• 采矿工程 • 上一篇    下一篇

地下金属矿山新型无矿柱连续开采方法试验研究

杨小聪1,杨志强1,解联库1,卫明2   

  1. 1.北京矿冶研究总院;2.安庆铜矿
  • 出版日期:2013-07-15 发布日期:2013-08-12

Experimental Research on the New Non-pillar Continuous Mining Method for Underground Metal Mines

Xiaocong1,Yang Zhiqiang1,Xie Lianku1,Wei Ming2   

  1. 1.Beijing General Research Institute of Mining and Metallurgy; 2.Anqing Copper Mine
  • Online:2013-07-15 Published:2013-08-12

摘要: 通过对安庆铜矿1#矿体整体开采方案的试验研究,提出一种地下金属矿山新型无矿柱连续开采方法:利用高强度尾砂胶结充填体和出矿底部结构的三角矿柱形成隔离层替代阶段间水平矿柱,并通过合理的采场布置、回采顺序和充填方法,确保各阶段采场安全高效开采。该方法为全矿体连续开采提供一种新思路,对丰富连续开采理论有着一定意义。

关键词: 地下金属矿山, 连续开采, 矿柱

Abstract: Through the experimental research on the entire mining scheme for 1# ore-body of Anqing Copper Mine,a new non-pillar continuous mining method for underground metal mines is proposed.In this method,a isolation layer formed by the high strength cemented tailing filling body and the triangle pillars at bottom structure replaces the horizontal floor pillars.Also,every mining step should be ensured to be safe and high efficient through reasonable stope layout,stoping sequence and backfill method.This method provides a new thought for the continuous mining of total ore-body.It has a certain significance for enriching the theory of the continuous mining.

Key words: Underground metal mine, Continuous mining, Ore pillar